My main system I work from had a CPU failure. I'm currently getting it RMA'd (free, because this is apparently a known issue with some batches of the CPU). But it'll be next week before I'm fully back up and running.
I'm working on getting things sync'd as able. I opened a PR to merge MDB 1.0 into mainline to prep it for 2.7.
Ondrej, there was this pipeline failure that I think is odd, because it reports the test succeeded and then marks it failed:
https://git.openldap.org/quanah/openldap/-/jobs/20114
Not sure if it's related to the recent changes to the test suite.
--Quanah